ss_blog_claim=699843adc7c0f13db241b443f8a8d347
home page
Get widget

Saturday, August 12, 2006

CURRENT POST

TBB

The Concrete Floor Poured

Here's more archived pictures, this time of the concrete floor curing.


The pipes are for toilets and other bathroom plumbing.
If you ask me, I think we're missing a few pipes,
but Jim says it's all we need.
I sure hope so!


Some of the concrete puddled.
As I remember, it rained while the floor was curing.
It turned out OK.


It was interesting to watch Jim and Chris on their knees
carefully trying to smooth out the wet concrete
to make it plumb while trying not to fall over in the stuff.
Let's just say I'm glad it wasn't me.
I wish I had gotten a picture of it,
but at the time we weren't living on site yet,
so I was stuck at home--my dad's house--with the kids.


Ah, the radiant floor heating tubes that will later be filled.
With what I don't know.
I haven't looked that far, but Jim knows.
Only he's not home to ask right now.
They're still empty so we can revisit that when it happens.


Jim must have been so tired after smoothing all the concrete
that his arm sagged taking this picture.
He was probably just glad the concrete floor was done.
Not bad work, eh? I'm impressed.

Labels: , ,

Bookmark and Share


0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

Links to this post:

Create a Link

<< Home